Experience and implemented projects
First: Projects in the field of water works:
Project details | Funded Party | Location | Cost | year |
Extension of a water network for the areas of Al-Halagiyah and Umm Al-Khail in Al- Rumaitha district as part of the business projects for the year 2008 | Al-Muthanna Governorate |
Rumaitha |
281,350,000 |
2008 |
Extension of a water network to the areas of Al Wahid, Al Bu Latif and Al Yunis in Al Swair district as part of the business projects for the year
2008 |
Al-Muthanna Governorate |
Al Swair |
248,000,000 |
2008 |
Extension of the water network of the village of Al-Khuraybat in Al-Swair district | ACTED
Organization |
Al Samawa | $ 72,000 | 2007 |
Extension of the water network of Al-Kawam in Al-Khader district | PRT .
Organization |
Al-Khader | $154,000 | 2009 |
A project to install and operate a 50 m 3 / hour collective water unit in the Al Bu Jarad area | Muthanna Governorate Water Directorate | Al Samawa | 285,615,000 | 2021 |
Rehabilitation and expansion of the Shamiya
project with a capacity of 500 m3/hour in the Shamiya district center |
Al-Diwaniyah Governorate | Al-
Shamiya District |
854,904,000 | 2023 |
Providing vertical water pumps (Booster Pumps), semi-injector reciprocating pumps (Dosing Pumps), and chlorine gas injection devices to water projects and complexes in the center, districts, and districts
.of Diwaniyah Governorate |
Al-Diwaniyah Governorate |
Al- Diwaniyah |
820,000,000 |
2023 |
Second: Projects in the field of sewage and lifting stations:
Project details | Funded Party | Location | Cost | year |
Implementation of a virtual rainwater network (channels), burying ponds in the 7th of April neighborhood in Samawa |
ACTED Organization |
Al Samawa |
$ 15,321 |
2005 |
Implementation of a rain water network in the Basateen Muhammad Ali area + competencies |
Al-Muthanna Governorate |
Al Samawa |
369,062,000 |
2021 |
Implementation of a rainwater network with a lifting station in Al-Karama district |
Al-Muthanna Governorate |
Al-Muthanna Governorate / Al-Karamah District |
623,491,500 |
2021 |
Third: Projects in the field of school buildings
Project details | Funded Party | Location | Cost | year |
Establishment of three classes and a health group in Al- Sabreen Primary School |
Mercy Corp. Organization |
Warka District |
$ 77,550 |
2009 |
A project to establish a secondary school for girls with a capacity of 12 classes in the center of Al-Hilal district |
Al-Muthanna Governorate |
Al-Muthanna Governorate / Al-Hilal District |
1,039,493,500 |
2021 |
The project of establishing a school with a capacity of 12 classrooms in the neighborhood of Abd al- Abbas / Al-Rumaitha |
Al-Muthanna Governorate |
Al-Rumaitha |
1,080,351,000 |
2021 |
Fourth: Municipal projects
Project details | Funded Party | Location | Cost | year |
Rehabilitation and paving of internal roads in Al-Karamah district |
Al-Muthanna Governorate |
Al-Muthanna Governorate / Al- Karamah District |
589,110,000 |
2021 |
Fifth: projects in the field of health
Project details | Funded Party | Location | Cost | year |
Rehabilitation project of Al- Hussein Teaching Hospital in Samawa | Dhi Qar Oil Company | Al-Muthanna Governorate / Al- Samawa |
4,854,017,000 |
2021 |
The project of establishing a gynecological and obstetric hospital in the Khidr district | Dhi Qar Oil Company | Al-Muthanna Governorate / Al- Samawa |
4,320,000,000 |
2022 |
Sixth: Communications networks and optical cable projects
Project details | Funded Party | Location | Cost | year |
Extension of pipes and manholes of the optical network in Muthanna | Muthanna Communications and Post Directorate |
Al Samawa |
2,690,000,000 |
2012 |
Extension and implementation of a telephone network in Al-Muthanna Governorate | Muthanna Communications and Post Directorate |
Al Samawa |
174,910,000 |
2012 |
Implementation of a telephone network in Al-Muthanna Governorate in Al-Shuhada neighborhood (cabin 52) with a length of
3000 m |
Muthanna Communications and Post Directorate |
Al Samawa |
75,000,000 |
2013 |
Implementation of a telephone network in Al-Muthanna Governorate in the 9th of April (cabin 54) with a length of 3500 m | Muthanna Communications and Post Directorate |
Al Samawa |
65,000,000 |
2013 |
The project of delivering the optical cable from the optical center of the Muthanna Communications and Post Directorate to the site of the Earthlink company in Al- Zahra district |
Earthlink Company |
Al Samawa |
28,500,000 |
2013 |
A project to extend an optical cable with a capacity of 24 hairs inside Dura Line between Samawa and Diwaniyah, the intersection of Afak | Muthanna Communications and Post Directorate |
Al Samawa |
452,750,000 |
2013 |
Changing the path of the optical cable to expand the entrance to the Darraji district and make manholes and light channels | Muthanna Communications and Post Directorate | Al-Muthanna
/ Al-Daraji district |
15,000,000 |
2014 |
The project of delivering the optical cable from the optical center of the Muthanna Communications and Post Directorate to the towers of Asiacell |
IQ Communications Company |
Al Samawa |
$ 95,000 |
2014 |
Extending optical cable channels and manholes in the Crescent district for the purpose of transferring services incompatible with the concrete bridge in the Crescent district |
Muthanna Communications and Post Directorate |
Al-Muthanna / Al-Hilal District |
28,750,000 |
2014 |
Extension of a telephone network in the Samawah district in the Sharqi region | Muthanna Communications and Post Directorate |
Al Samawa |
22,500,000 |
2014 |
Extending the network of optical lines, the | Muthanna | Al Samawa | $ 700,000 | 2015 |
FTTH project, with a capacity of 5,000 subscribers, to the neighborhoods of the police, the Republican, the workers, the military, Al-Dajriya, Al-Shuhada, and Al-
Haidariya |
Communications and Post Directorate / Alcatel-Lucent Company | |||
The project of delivering the optical cable from the optical center of the Muthanna Communications and Post Directorate to the traffic numbers lab | Muthanna Communications and Post Directorate / General Salam
Company |
Al Samawa |
40,000,000 |
2015 |
The project to connect the optical cable from the Rumaitha switch to the site of the
Earth Link company tower in Rumaitha |
Earthlink Company | Al Rumaitha | 15,000,000 | 2017 |
A project to implement a path linking the FTTH project, the optical fiber network, with the PDN station in the Markaz complex to the Al-Qashla area, using the
.Micro Cutter method |
Muthanna Communications and Post Directorate |
Al Samawa |
49,900,000 |
2017 |
Implementation project of a path linking the FTTH project of the fiber-optic network with the PDN station in the center
complex across the Samawa Corniche and using the Micro Cutter method |
Muthanna Communications and Post Directorate |
Al Samawa |
49,400,000 |
2017 |
The project of delivering the backup optical cable from the optical center to the switch of the FTTH optical access project within the Muthanna Communications and
Post Directorate |
Muthanna Communications and Post Directorate |
Al Samawa |
38,000,000 |
2017 |
The project of delivering the optical cable from the optical center of the Directorate of Communications and Postal Muthanna to the site of the Earthlink company to site
No. 1 and No. 5 of the Earthlink company |
Earthlink Company |
Al Samawa |
38,750,000 |
2017 |
Seventh: Electricity projects
Project details | The beneficiary | Cost | year |
Expansion of the electricity
network in the village of Al Bu Khashim in Al-Najmi sub-district |
General Directorate of Electric Power Transmission Projects | $ 77,000 | 2012 |
The project of brushes and gravel curbs for the South Diwaniyah
Transfer Station 132 kV |
General Directorate of Electric Power Transmission Projects | 98,000,000 | 2013 |
Project of brushes and gravel curbs for the transfer station west of
Diwaniyah 132 kV |
General Directorate of Electric Power Transmission Projects | 80,500,000 | 2013 |
Civil works project for Al- Ibrahimiya substation 132 kV in
Karbala governorate |
General Directorate of Electric Power Transmission Projects | 98,775,000 | 2013 |
Project of brushes and gravel mixers for the Ibrahimiya transfer station in
Karbala Governorate 132 KV |
General Directorate of Electric Power Transmission Projects | 21,540,000 | 2013 |
Project of skimming works, workshops, brushes, and tamping gravel for the Diwaniyah South
Substation 132 kV |
General Directorate of Electric Power Transmission Projects |
48,000,000 |
2013 |
The project of excavation and replacement works for the need for the fence for the Diwaniyah power
station / Shamiya district |
The Arab Contractors Company (Othman Ahmed Othman and Partners) |
$ 152,000 |
2013 |
Supplying crushed sand and gravel to a concrete mixing station for Al- Diwaniyah power station, Al-
Shamiya district |
The Arab Contractors Company (Othman Ahmed Othman and Partners) |
$ 134,800 |
2013 |
Building a health group at Al-Diwaniyah
power station |
El Sewedy Powers Company with the
Arab Contractors Company |
$6,000 | 2014 |
Replacing gravel material with the
gravel |
The Arab Contractors Company (Othman Ahmed Othman & Partners) | $ 78,000 | 2014 |
The project of transferring 11 kV feeder loads to the new Samawa
station 132 kV |
The General Company for the Distribution of South Electricity / Al- Mathah Branch | 672,391,000 | 2021 |
The project of developing 11 kV Al-Budairi feeders from the old Al-
Khidr station |
The General Company for the Distribution of South Electricity / Al- Mathah Branch | 556,450,000 | 2021 |