Experience and implemented projects

Experience and implemented projects

First: Projects in the field of water works:

Project details Funded Party Location Cost year
Extension of a water network for the areas of Al-Halagiyah and Umm Al-Khail in Al- Rumaitha district as part of the business projects for the year 2008 Al-Muthanna Governorate  

Rumaitha

 

281,350,000

 

2008

Extension of a water network to the areas of Al Wahid, Al Bu Latif and Al Yunis in Al Swair district as part of the business projects for the year

2008

Al-Muthanna Governorate  

Al Swair

 

248,000,000

 

2008

Extension of the water network of the village of Al-Khuraybat in Al-Swair district ACTED

Organization

Al Samawa $ 72,000 2007
Extension of the water network of Al-Kawam in Al-Khader district PRT .

Organization

Al-Khader $154,000 2009
A project to install and operate a 50 m 3 / hour collective water unit in the Al Bu Jarad area Muthanna Governorate Water Directorate Al Samawa 285,615,000 2021
Rehabilitation and expansion of the Shamiya

project with a capacity of 500 m3/hour in the Shamiya district center

Al-Diwaniyah Governorate Al-

Shamiya District

854,904,000 2023
Providing vertical water pumps (Booster Pumps), semi-injector reciprocating pumps (Dosing Pumps), and chlorine gas injection devices to water projects and complexes in the center, districts, and districts

.of Diwaniyah Governorate

 

Al-Diwaniyah Governorate

 

Al- Diwaniyah

 

820,000,000

 

2023

Second: Projects in the field of sewage and lifting stations:

Project details Funded Party Location Cost year
Implementation of a virtual rainwater network (channels), burying ponds in the 7th of April neighborhood in Samawa  

 

ACTED

Organization

 

 

Al Samawa

 

 

$ 15,321

 

 

2005

Implementation of a rain water network in the Basateen Muhammad Ali area + competencies  

Al-Muthanna Governorate

 

 

Al Samawa

 

369,062,000

 

2021

Implementation of a rainwater network with a lifting station in Al-Karama district  

Al-Muthanna Governorate

Al-Muthanna Governorate / Al-Karamah District  

 

623,491,500

 

 

2021

Third: Projects in the field of school buildings 

Project details Funded Party Location Cost year
Establishment of three classes and a health group in Al- Sabreen Primary School  

Mercy Corp. Organization

 

Warka District

 

$ 77,550

 

2009

A project to establish a secondary school for girls with a capacity of 12 classes in the center of Al-Hilal district  

 

Al-Muthanna Governorate

 

Al-Muthanna Governorate / Al-Hilal District

 

 

1,039,493,500

 

 

2021

The project of establishing a school with a capacity of 12 classrooms in the neighborhood of Abd al- Abbas / Al-Rumaitha  

 

 

Al-Muthanna Governorate

 

 

 

Al-Rumaitha

 

 

 

1,080,351,000

 

 

 

2021

Fourth: Municipal projects 

Project details Funded Party Location Cost year
Rehabilitation and paving of internal roads in Al-Karamah district  

Al-Muthanna Governorate

Al-Muthanna Governorate / Al- Karamah District  

589,110,000

 

2021

Fifth: projects in the field of health 

Project details Funded Party Location Cost year
Rehabilitation project of Al- Hussein Teaching Hospital in Samawa Dhi Qar Oil Company Al-Muthanna Governorate / Al- Samawa  

4,854,017,000

 

2021

The project of establishing a gynecological and obstetric hospital in the Khidr district Dhi Qar Oil Company Al-Muthanna Governorate / Al- Samawa  

4,320,000,000

 

2022

Sixth: Communications networks and optical cable projects

Project details Funded Party Location Cost year
Extension of pipes and manholes of the optical network in Muthanna Muthanna Communications and Post Directorate  

Al Samawa

 

2,690,000,000

 

2012

Extension and implementation of a telephone network in Al-Muthanna Governorate Muthanna Communications and Post Directorate  

Al Samawa

 

174,910,000

 

2012

Implementation of a telephone network in Al-Muthanna Governorate in Al-Shuhada neighborhood (cabin 52) with a length of

3000 m

Muthanna Communications and Post Directorate  

Al Samawa

 

75,000,000

 

2013

Implementation of a telephone network in Al-Muthanna Governorate in the 9th of April (cabin 54) with a length of 3500 m Muthanna Communications and Post Directorate  

Al Samawa

 

65,000,000

 

2013

The project of delivering the optical cable from the optical center of the Muthanna Communications and Post Directorate to the site of the Earthlink company in Al- Zahra district  

 

Earthlink Company

 

 

Al Samawa

 

 

28,500,000

 

 

2013

A project to extend an optical cable with a capacity of 24 hairs inside Dura Line between Samawa and Diwaniyah, the intersection of Afak Muthanna Communications and Post Directorate  

Al Samawa

 

452,750,000

 

2013

Changing the path of the optical cable to expand the entrance to the Darraji district and make manholes and light channels Muthanna Communications and Post Directorate Al-Muthanna

/ Al-Daraji district

 

15,000,000

 

2014

The project of delivering the optical cable from the optical center of the Muthanna Communications and Post Directorate to the towers of Asiacell  

IQ Communications Company

 

Al Samawa

 

$ 95,000

 

2014

Extending optical cable channels and manholes in the Crescent district for the purpose of transferring services incompatible with the concrete bridge in the Crescent district  

Muthanna Communications and Post Directorate

 

Al-Muthanna

/ Al-Hilal District

 

 

28,750,000

 

 

2014

Extension of a telephone network in the Samawah district in the Sharqi region Muthanna Communications and Post Directorate  

Al Samawa

 

22,500,000

 

2014

Extending the network of optical lines, the Muthanna Al Samawa $ 700,000 2015
FTTH project, with a capacity of 5,000 subscribers, to the neighborhoods of the police, the Republican, the workers, the military, Al-Dajriya, Al-Shuhada, and Al-

Haidariya

Communications and Post Directorate / Alcatel-Lucent Company
The project of delivering the optical cable from the optical center of the Muthanna Communications and Post Directorate to the traffic numbers lab Muthanna Communications and Post Directorate / General Salam

Company

 

Al Samawa

 

40,000,000

 

2015

The project to connect the optical cable from the Rumaitha switch to the site of the

Earth Link company tower in Rumaitha

Earthlink Company Al Rumaitha 15,000,000 2017
A project to implement a path linking the FTTH project, the optical fiber network, with the PDN station in the Markaz complex to the Al-Qashla area, using the

.Micro Cutter method

Muthanna Communications and Post Directorate  

Al Samawa

 

49,900,000

 

2017

Implementation project of a path linking the FTTH project of the fiber-optic network with the PDN station in the center

complex across the Samawa Corniche and using the Micro Cutter method

Muthanna Communications and Post Directorate  

Al Samawa

 

49,400,000

 

2017

The project of delivering the backup optical cable from the optical center to the switch of the FTTH optical access project within the Muthanna Communications and

Post Directorate

Muthanna Communications and Post Directorate  

Al Samawa

 

38,000,000

 

2017

The project of delivering the optical cable from the optical center of the Directorate of Communications and Postal Muthanna to the site of the Earthlink company to site

No. 1 and No. 5 of the Earthlink company

Earthlink Company  

Al Samawa

 

38,750,000

 

2017

Seventh: Electricity projects

Project details The beneficiary Cost year
Expansion of the electricity

network in the village of Al Bu Khashim in Al-Najmi sub-district

General Directorate of Electric Power Transmission Projects $ 77,000 2012
The project of brushes and gravel curbs for the South Diwaniyah

Transfer Station 132 kV

General Directorate of Electric Power Transmission Projects 98,000,000 2013
Project of brushes and gravel curbs for the transfer station west of

Diwaniyah 132 kV

General Directorate of Electric Power Transmission Projects 80,500,000 2013
Civil works project for Al- Ibrahimiya substation 132 kV in

Karbala governorate

General Directorate of Electric Power Transmission Projects 98,775,000 2013
Project of brushes and gravel mixers for the Ibrahimiya transfer station in

Karbala Governorate 132 KV

General Directorate of Electric Power Transmission Projects 21,540,000 2013
Project of skimming works, workshops, brushes, and tamping gravel for the Diwaniyah South

Substation 132 kV

 

General Directorate of Electric Power Transmission Projects

 

48,000,000

 

2013

The project of excavation and replacement works for the need for the fence for the Diwaniyah power

station / Shamiya district

The Arab Contractors Company (Othman Ahmed Othman and Partners)  

$ 152,000

 

2013

Supplying crushed sand and gravel to a concrete mixing station for Al- Diwaniyah power station, Al-

Shamiya district

The Arab Contractors Company (Othman Ahmed Othman and Partners)  

$ 134,800

 

2013

Building a health group at Al-Diwaniyah

power station

El Sewedy Powers Company with the

Arab Contractors Company

$6,000 2014
Replacing gravel material with the

gravel

The Arab Contractors Company (Othman Ahmed Othman & Partners) $ 78,000 2014
The project of transferring 11 kV feeder loads to the new Samawa

station 132 kV

The General Company for the Distribution of South Electricity / Al- Mathah Branch 672,391,000 2021
The project of developing 11 kV Al-Budairi feeders from the old Al-

Khidr station

The General Company for the Distribution of South Electricity / Al- Mathah Branch 556,450,000 2021